The problem
A BOM held in a spreadsheet and a routing held in the planner's head produce a standard cost nobody can defend. When the engineering change happens, the cost model does not move with it.
Revision control is not documentation discipline. It is what makes a variance attributable to a change rather than to an unexplained drift.
Core workflow
Design to production-ready structure.
01
Item master
Raw, semi-finished and finished, with attributes.
02
Bill of material
Multi-level structure with quantities and wastage.
03
Routing
Operations, work centres, setup and run times.
04
Standard cost
Rolled up from material, labour and overhead.
05
Change control
ECO raised, impact assessed, revision issued.
06
Release
Revision effective from a date, old orders unaffected.
What it covers
Structure
Multi-level BOMPhantom and alternate BOMsComponent substitution rulesWastage and yield factorsBy-products and co-products
Routing
Operations and sequenceWork centres and capacitySetup and run timeSubcontract operationsAlternate routings
Change control
Revision historyEngineering change ordersCost impact assessmentEffective datesApproval workflow
Connects with
Operational outcomes
1
BOM of record, not a spreadsheet
100%
Cost changes traced to an ECO
−64%
Orders built on a stale revision
Same day
Standard cost after a change
Ranges observed on Al Jawad engagements. Targets agreed in assessment.