MANUFACTURING
The problem
Production data collected on paper and typed in the next morning is not control, it is history. By the time the shift report is legible, the shift is over and the decision it would have informed is past.
OEE is only useful when its three components are separable: availability, performance and quality each have a different owner and a different fix.
Core workflow
Release to completion.
01
Release
Work order and routing pushed to the work centre.
02
Clock-on
Operator and machine identified, time starts.
03
Production
Good quantity, scrap and rework recorded as made.
04
Downtime
Stops reason-coded — breakdown, changeover, material.
05
Quality
In-process checks recorded against the operation.
06
Completion
Put to stock, cost posted, OEE updated.
What it covers
Execution
Work order dispatch listOperator clock-on and offOutput and scrap captureRework and re-inspectionShift handover notes
Downtime
Reason-coded stopsBreakdown to maintenanceChangeover trackingMaterial and labour waitsAndon escalation
Performance
OEE — availability, performance, qualityOutput per shift and lineCycle time against standardWork-centre utilisationOperator productivity
Connects with
Operational outcomes
74.2%
Overall equipment effectiveness
Real time
Output and downtime capture
−41%
Unplanned downtime hours
100%
Stops with a coded reason
Ranges observed on Al Jawad engagements. Targets agreed in assessment.