How Pylox Made BOQ Pricing, Budget Control and Retention Easier in Odoo

ClientPylox
IndustryConstruction & real estate
CountryUnited Arab Emirates

A contractor prices a job from a bill of quantities, buys against a budget, pays subcontractors for certified work and waits for retention to be released. Al Jawad Software House shaped Odoo around that chain for Pylox, a contracting company in the UAE, from the tender through to retention on both sides.

The business

A bill of quantities, or BOQ, is the priced list of work a contractor quotes. The BOQ becomes the quotation, then the budget, then the basis for what is bought and what subcontractors are paid. When each step lives in a separate spreadsheet, the numbers drift apart.

Where the work gets hard

A price is a stack of costs. Job cost, contingency, site running costs, equipment, office overhead and a defects period all sit under the profit. A flat margin does not describe it.

Purchasing must respect the budget. A request that goes over its project budget should be seen, not slip through.

Subcontractors are paid on certified progress. The work is measured and certified, and a share is held back as retention to be released later.

The client holds retention too. Money held back from the contractor has to be tracked until it is released, and advances have to be recovered.

Bigger payments need more approvers. Purchases, expenses and subcontractor payments need more sign-off as their value rises.

What we implemented

Quotations built from cost

A quotation is built as a BOQ, and an existing BOQ can be imported from Excel. Each line starts from its job cost. The other cost layers are added on top, then profit, which gives the selling price. The quotation can be exported to Excel in the format the client expects. A single action then creates the project budget from the BOQ cost lines.

Purchasing held to the budget

Purchase requests raised on a project are checked against its budget. A request within budget goes through. A request over budget is flagged, locked and sent to a senior approver.

Subcontractors and retention

A subcontract agreement leads to work orders, variations and progress claims. Each claim is measured, certified, invoiced and paid, with retention held back. Retention is released later through its own record, so the amount held, released and still owed is always visible. On customer invoices, retention is withheld and released the same way, and down payments are handled separately.

Life of a subcontract claim

Approvals by value

Rules define who must approve a purchase order, expense or subcontractor payment as the value grows. The purchase order shows the approval levels it needs.

Equipment cost

Equipment use is charged to the project it served.

How the work gets easier

The usual wayWith the new process
The price is built in a spreadsheet and retyped for the budgetThe BOQ gives the price and the budget together
Over-budget purchases are noticed after the orderOver-budget requests are flagged and held for approval
Subcontractor payments rest on informal agreementEach payment follows a measured, certified claim
Retention is tracked on the sideHeld, released and outstanding retention is on record
Approval levels depend on who is askedThe required approvers follow the value
Equipment cost is shared out at month endEquipment use is charged to its project

The result is a chain where each number comes from the one before it.

The usual way and the new way